Skip to main content
Operations workspace
Mock connectors only

Mock/sandbox only. Production authority submission requires configured credentials, authority onboarding, operator approval, data protection controls, and retention policy review. Mock and sandbox outputs are not legal authority submissions.

API checkingProduction lockedchecking postureReviews -Submissions -Blockers -Updated not loaded yet

Settings

Company profile, operator identity, data retention, approval roles, and deployment readiness.

Production lockedProduction authority submission remains blocked until readiness items are resolved.Last updated: not loaded yet
API loading

Company profile

FieldValue
Legal company name-
UK EORINot configured
EU EORINot configured
Contact emailNot configured
Operator roleHaulier / freight forwarder

Production readiness blockers

AreaStatus
Production gateNo current blocking items

Real integration prerequisites

AreaStatus
HMRC Developer HubRequired before sandbox or production connector use
French ELO accessRequired before real France smart-border connector use
ICS2 UUM&DS certificatesRequired before S2S gateway sidecar
Retention and backup policyRequired before production pilot
Manual fallback processRequired before production submission approval